The corkscrew shakes off the soil.JPG
Viewed: 102 times.
|
Recycled Concret being delivered.JPG
Viewed: 79 times.
|
Geopiers being installed, recycled concret is pounded in. .JPG
Viewed: 92 times.
|
Geopier installation continues.JPG
Viewed: 83 times.
|
From the southern edge of the plant site, facing north.JPG
Viewed: 87 times.
|
from the NE corner of the site facing south.JPG
Viewed: 74 times.
|
From the middle of the plant area facing east, the flags are for Geopier installation.JPG
Viewed: 75 times.
|
from near the NE corner, facing SW. .JPG
Viewed: 71 times.
|
From midsite, facing NE, the flags are for Geopier installation.JPG
Viewed: 65 times.
|
From mid site north.JPG
Viewed: 66 times.
|
From first driveway facing north. The dirt pile is on the left.JPG
Viewed: 66 times.
|
Boring to install the recycled concret.JPG
Viewed: 91 times.
|