A pile of corn stalks, they are used as insulation to prevent freezing.JPG
Viewed: 75 times.
|
Bunge, from Bunge Blvd..JPG
Viewed: 72 times.
|
dirt is removed to complete over-excavation.JPG
Viewed: 71 times.
|
Drilling, on the far eastern edge of the work area..JPG
Viewed: 71 times.
|
Facing east from within the constrution area.JPG
Viewed: 55 times.
|
Facing NE from behind the Geopier installation.JPG
Viewed: 61 times.
|
From 189th Street and the access road, facing North.JPG
Viewed: 58 times.
|
From 189th Street, facing West.JPG
Viewed: 72 times.
|
From MidAm Driveway, facing due south. dirt mound in the background.JPG
Viewed: 60 times.
|
From MidAm driveway, facing SE. Geopier installation equipment in the forground.JPG
Viewed: 64 times.
|
From MidAm Driveway, facing SW.JPG
Viewed: 63 times.
|
From our NE corner, the culverts are in..JPG
Viewed: 53 times.
|
From the NE corner, facing SW..JPG
Viewed: 72 times.
|
from the SE corner, facing MidAm.JPG
Viewed: 88 times.
|
From the Southside of the project, facing South.JPG
Viewed: 67 times.
|
Grading continues, the CB Waste Water treament plant is in the background.JPG
Viewed: 63 times.
|
I believe this dirt will be reused.JPG
Viewed: 59 times.
|
It almost looks like we have a flock of flamingos.JPG
Viewed: 68 times.
|
Lots of activity to watch out for..JPG
Viewed: 53 times.
|
Mid Am stack in the distance, foggy morning.JPG
Viewed: 55 times.
|
The water tank follows the dirt work..JPG
Viewed: 71 times.
|